This will give you an idea of boat work.
Rebuilt old shower sump, re-engineering system and relocating pump. |
Added an ultra-sonic (Kerry calls it Super-Sonic) hull cleaning system. Yes, so far it seems to be working. Our hull is staying cleaner than our neighbors. |
This included four transponders that were affixed to the hull with epoxy. |
Rebuilt the Pilot House steering system. |
Spent days chasing a coolant leak that basically amounted to a chafed heat exchange hose to the water heater. |
Removed our old holding tank converting the usable space to sto |
Scrubbed and cleaned the teak decks. I still think there is life in this deck. |
Stripped all the moldy Teak Oil and blistered Cetol off the caprails, teak topsides and cockpit. This is Semco Teak Sealer in Gold Tone. |
All the gold leaf is complete, including the cove stripe. |
Upgraded the Bimini so... |
We were able to add solar. This is a 200 Watt Renogy kit with controller. |
Built a new deck box out of teak spa mats ordered from Amazon. |
This was my beautiful overhead. Unfortunately, it hid a few small leaks. |