Wednesday, October 19, 2016

All we have been doing...



This will give you an idea of boat work.

Rebuilt old shower sump, re-engineering system and relocating pump.

Added an ultra-sonic (Kerry calls it Super-Sonic) hull cleaning system. Yes, so far it seems to be working. Our hull is staying cleaner than our neighbors.

This included four transponders that were affixed to the hull with epoxy.

Rebuilt the Pilot House steering system.
Spent days chasing a coolant leak that basically amounted to a chafed heat exchange hose to the water heater.

Removed our old holding tank converting the usable space to sto

Scrubbed and cleaned the teak decks. I still think there is life in this deck.

Stripped all the moldy Teak Oil and blistered Cetol off the caprails, teak topsides and cockpit. This is Semco Teak Sealer in Gold Tone.


All the gold leaf is complete, including the cove stripe.

Upgraded the Bimini so...

We were able to add solar. This is a 200 Watt Renogy kit with controller.
Built a new deck box out of teak spa mats ordered from Amazon.
This was my beautiful overhead. Unfortunately, it hid a few small leaks.


Tore the entire head liner out so I could get to things.

Rebed the staysail tracks.

2 comments:

  1. Didn't realize you had installed that "super sonic" hull cleaning system. We'll want to talk to you about that. Let us know if you decide on a date to get together to go over that invoice.

    ReplyDelete
  2. Please consider a Jordan Series Drogue
    Thanks
    Dave Pelissier Ace Sailmakers East Lyme CT

    ReplyDelete